SYS.2.BP3 Analyze system requirements
(
)
Analyze the specified system requirements including their interdependencies to ensure correctness, technical feasibility and verifiability, and to support risk identification. Analyze the impact on cost, schedule and the technical impact. NOTE 4: The analysis of impact on cost and schedule supports the adjustment of project estimates. Refer to MAN.3.BP5.