Overview - SWE.1 Software Requirements Analysis ()
Overview - SWE.1 Software Requirements Analysis
11-04 Product release package
SWE.1 Software Requirements Analysis
SWE.1.BP3 Analyze software requirements
SWE.1.BP2 Structure software requirements
SWE.1.BP5 Develop verification criteria
SWE.1.BP4 Analyze the impact on the operating environment
SWE.1.BP1 Specify software requirements
SWE.1.BP6 Establish bidirectional traceability
SWE.1.BP7 Ensure consistency
SWE.1.BP8 Communicate agreed software requirements
SWE.1.O.1 The software requirements to be allocated to the software elements ofthe system and their interfaces are defined
SWE.1.O.2 Software requirements are categorized and analyzed for correctness and verifiability
SWE.1.O.3 The impact of software requirements on the operating environment is analyzed
SWE.1.O.4 Prioritization for implementing the software requirements is defined
SWE.1.O.5 The software requirements are updated as needed
SWE.1.O.6 Consistency and bidirectional traceability are established between system requirements and software requirements; and consistency and bidirectional traceability are established between system architectural design and software requirements
SWE.1.O.7 The software requirements are evaluated for cost, schedule andtechnical impact
SWE.1.O.8 The software requirements are agreed and communicated to allaffected parties
13-19 Review Record
13-21 Change control record
13-22 Traceability record
15-01 Analysis report
17-08 Interface requirements specification
17-11 Software requirements specification
17-50 Verification criteria
O. vs. BP. vs. WP. - SWE.1 Software Requirements Analysis
Overview - Process Reference Model