Overview - SYS.5 System Qualification Test ()
Overview - SYS.5 System Qualification Test
08-50 Test specification
08-52 Test plan
13-04 Communication Record
13-19 Review Record
13-22 Traceability record
13-50 Test result
SYS.5 System Qualification Test
SYS.5.BP3 Select test cases
SYS.5.BP2 Develop specification for system qualification test
SYS.5.BP5 Establish bidirectional traceability
SYS.5.BP4 Test integrated system
SYS.5.BP1 Develop system qualification test strategy including regression test strategy
SYS.5.BP6 Ensure consistency
SYS.5.BP7 Summarize and communicate results
SYS.5.O.1 A system qualification test strategy including regression test strategy consistent with the project plan and release plan is developed to test the integrated system
SYS.5.O.2 A specification for system qualification test of the integrated system according to the system qualification test strategy is developed that issuitable to provide evidence for compliance with the system requirements
SYS.5.O.3 Test cases included in the system qualification test specification are selected according to the system qualification test strategy and the release plan
SYS.5.O.4 The integrated system is tested using the selected test cases and the results of system qualification test are recorded
SYS.5.O.5 Consistency and bidirectional traceability are established between system requirements and test cases included in the system qualification test specification and between test cases and test results
SYS.5.O.6 results of the system qualification test are summarized and communicated to all affected parties
O. vs. BP. vs. WP. - SYS.5 System Qualification Test
Overview - Process Reference Model